|                   |
This page created: 03/16/2026 08:28:18 AM Click here for Comprehensive Report
COUNTY: BOLIVAR (Supervisor District 2) DATE OF LAST INSPECTION.: 1025
[Supervisor District 5] INSPECTION INTERVAL.....: 12 MONTHS
STRUCTURE NUMBER...: SA0600000000040
LOCATION...........: SEC 9 T21N R 6W
FACILITY CARRIED...: HOWARD ROAD
FEATURE INTERSECTED: ICY BOGUE CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1971
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 10
BYPASS/DETOUR LENGTH.: 4 MI.
DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 2 - CRITICAL CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION
BRIDGE PROGRAM ELIGLBLITY: LSBP
BRIDGE POSTING...........: P - Posted for load
RECOMMENDED TO BE CLOSED
H TRUCK (TONS)...................... 25
HS SHORT (TONS)..................... 39
EMERGENCY VEHICLE TYPE EV2 (TONS)... 17
EMERGENCY VEHICLE TYPE EV3 (TONS)... 21
EMERGENCY VEHICLE GROSS (TONS)...... 29
|