This page created: 04/06/2026 07:41:27 AM

COUNTY: BOLIVAR   (Supervisor District 4)     DATE OF LAST INSPECTION.: 1124
                  [Supervisor District 3]     INSPECTION INTERVAL.....: 24 MONTHS
STRUCTURE NUMBER...: SA0600000000079
LOCATION...........: SEC  2 T22N R 5W B
FACILITY CARRIED...: ZUMBRO ROAD       
FEATURE INTERSECTED: SUNFLOWER RIVER          
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 302

    STEEL STRINGER/MULTI-BEAM OR GIRDER

YEAR BUILT......................: 1961
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 230
BYPASS/DETOUR LENGTH.:  9 MI. 

DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 7 - GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)...................... 26
                           HS SHORT (TONS).....................  35
                           EMERGENCY VEHICLE SINGLE AXLE (TONS)  17
                           EMERGENCY VEHICLE TANDEM AXLE (TONS)  21
                           EMERGENCY VEHICLE GROSS (TONS)......  30