This page created: 01/27/2026 07:25:50 AM 

COUNTY: BOLIVAR   (Shelby)                    DATE OF LAST INSPECTION.: 1024
                  [Supervisor District 3]
STRUCTURE NUMBER...: SA060000000A200
LOCATION...........: SEC 12 T24N R 6W B
FACILITY CARRIED...: W. SECOND AVE.    
FEATURE INTERSECTED: HOLMES LAKE              
FUNCTIONAL CLASS...: RURAL MAJOR COLLECTOR
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

BRIDGE LENGTH.........:    68.9 FT
NUMBER OF SPANS.......: 3
SKEW ANGLE............: 00 DEG
APPROACH ROADWAY WIDTH: 22.0 FT
BRIDGE ROADWAY WIDTH..: 29.9 FT

YEAR BUILT......................: 2020
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 810
BYPASS/DETOUR LENGTH.:  7 MI. 

DECK RATING..........: 8 - VERY GOOD CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 8 - VERY GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION

BRIDGE PROGRAM ELIGLBLITY:     
BRIDGE POSTING...........: 
                           A - OPEN NO RESTRICTIONS