This page created: 01/27/2026 07:25:50 AM 

COUNTY: CALHOUN   (Supervisor District 3)     DATE OF LAST INSPECTION.: 0425
                  [Supervisor District 3]
STRUCTURE NUMBER...: SA0700000000021
LOCATION...........: SEC 33 T11S R 2W B
FACILITY CARRIED...: CR 275            
FEATURE INTERSECTED: SPRING CREEK             
FUNCTIONAL CLASS...: RURAL MAJOR COLLECTOR
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119

    CONCRETE BOX BRIDGE

BRIDGE LENGTH.........:    22.0 FT
NUMBER OF SPANS.......: 2
SKEW ANGLE............: 00 DEG
APPROACH ROADWAY WIDTH: 20.0 FT
BRIDGE ROADWAY WIDTH..:  0.0 FT

YEAR BUILT......................: 1954
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 300
BYPASS/DETOUR LENGTH.:  6 MI. 

DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 7 - GOOD CONDITION

BRIDGE PROGRAM ELIGLBLITY:     
BRIDGE POSTING...........: 
                           A - OPEN NO RESTRICTIONS