|                   |
This page created: 01/27/2026 07:25:50 AM
COUNTY: CLAY (Supervisor District 5) DATE OF LAST INSPECTION.: 1225
[Supervisor District 5]
STRUCTURE NUMBER...: SA1300000000110
LOCATION...........: SEC 20 T20N R13E B
FACILITY CARRIED...: PHEBA COLONY RD
FEATURE INTERSECTED: DOUBLE CABIN CREEK
FUNCTIONAL CLASS...: RURAL MAJOR COLLECTOR
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119
CONCRETE BOX BRIDGE
BRIDGE LENGTH.........: 31.8 FT
NUMBER OF SPANS.......: 2
SKEW ANGLE............: 45 DEG
APPROACH ROADWAY WIDTH: 27.9 FT
BRIDGE ROADWAY WIDTH..: 23.0 FT
YEAR BUILT......................: 1977
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 970
BYPASS/DETOUR LENGTH.: 7 MI.
DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 6 - SATISFACTORY CONDITION
CHANNEL RATING.......: 5 - FAIR CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........:
A - OPEN NO RESTRICTIONS
|