|                   |
This page created: 03/16/2026 08:28:18 AM Click here for Comprehensive Report
COUNTY: FRANKLIN (Supervisor District 1) DATE OF LAST INSPECTION.: 1124
[Supervisor District 1] INSPECTION INTERVAL.....: 24 MONTHS
STRUCTURE NUMBER...: SA1900000000004
LOCATION...........: SEC 16 T 5N R 1E B
FACILITY CARRIED...: LIBERTY ROAD
FEATURE INTERSECTED: BAYOU CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 302
STEEL STRINGER/MULTI-BEAM OR GIRDER
YEAR BUILT......................: 1966
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 430
BYPASS/DETOUR LENGTH.: 1 MI.
DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 6 - SATISFACTORY CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION
BRIDGE PROGRAM ELIGLBLITY: SABP
BRIDGE POSTING...........: P - Posted for load
H TRUCK (TONS)...................... 15
HS SHORT (TONS)..................... 24
HS LONG (TONS)...................... 28
EMERGENCY VEHICLE TYPE EV2 (TONS)... 17
EMERGENCY VEHICLE TYPE EV3 (TONS)... 25
EMERGENCY VEHICLE GROSS (TONS)...... 34
|