This page created: 01/27/2026 07:25:50 AM 

COUNTY: GEORGE   (Supervisor District 5)      DATE OF LAST INSPECTION.: 0124
                 [Supervisor District 5]
STRUCTURE NUMBER...: SA2000000000066
LOCATION...........: SEC 15 T 3S R 9W B
FACILITY CARRIED...: BROOME SCHOOL RD  
FEATURE INTERSECTED: POPLAR CREEK             
FUNCTIONAL CLASS...: RURAL MINOR COLLECTOR
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 219

    CONCRETE CONTINUOUS BOX BRIDGE

BRIDGE LENGTH.........:    27.9 FT
NUMBER OF SPANS.......: 2
SKEW ANGLE............: 30 DEG
APPROACH ROADWAY WIDTH: 27.6 FT
BRIDGE ROADWAY WIDTH..:  0.0 FT

YEAR BUILT......................: 1999
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 300
BYPASS/DETOUR LENGTH.: 12 MI. 

DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 8 - VERY GOOD CONDITION

BRIDGE PROGRAM ELIGLBLITY:     
BRIDGE POSTING...........: 
                           A - OPEN NO RESTRICTIONS