This page created: 01/27/2026 07:25:50 AM 

COUNTY: GREENE   (Supervisor District 4)      DATE OF LAST INSPECTION.: 1024
                 [Supervisor District 4]
STRUCTURE NUMBER...: SA2100000000017
LOCATION...........: SEC 27 T 1N R 7W B
FACILITY CARRIED...: VERNAL RIVER RD   
FEATURE INTERSECTED: TAYLOR CREEK             
FUNCTIONAL CLASS...: RURAL MAJOR COLLECTOR
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

BRIDGE LENGTH.........:    68.9 FT
NUMBER OF SPANS.......: 3
SKEW ANGLE............: 00 DEG
APPROACH ROADWAY WIDTH: 32.2 FT
BRIDGE ROADWAY WIDTH..: 27.9 FT

YEAR BUILT......................: 1989
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 140
BYPASS/DETOUR LENGTH.:  9 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 7 - GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION

BRIDGE PROGRAM ELIGLBLITY:     
BRIDGE POSTING...........: 
                           A - OPEN NO RESTRICTIONS