This page created: 05/11/2026 07:24:45 AM

COUNTY: GRENADA   (Supervisor District 3)     DATE OF LAST INSPECTION.: 1124
                  [Supervisor District 3]     INSPECTION INTERVAL.....: 24 MONTHS
STRUCTURE NUMBER...: SA2200000000044
LOCATION...........: SEC 17 T22N R 7E  
FACILITY CARRIED...: BUTPUTTER RD.  118
FEATURE INTERSECTED: RELIEF DITCH             
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1995
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 50
YEAR OF ADT..........: 2015
BYPASS/DETOUR LENGTH.:  6 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 7 - GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION


BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS