This page created: 03/16/2026 08:28:18 AM                       Click here for Comprehensive Report

COUNTY: HINDS   (Supervisor District 4)       DATE OF LAST INSPECTION.: 0225
                [Supervisor District 4]       INSPECTION INTERVAL.....: 12 MONTHS
STRUCTURE NUMBER...: SA2500000000173
LOCATION...........: SEC 15 T 5N R 3W B
FACILITY CARRIED...: CHAPEL HILL RD    
FEATURE INTERSECTED: TURKEY CREEK             
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1970
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 300
BYPASS/DETOUR LENGTH.:  6 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)...................... 18
                           HS SHORT (TONS).....................  25
                           HS LONG (TONS)......................  30
                           EMERGENCY VEHICLE TYPE EV2 (TONS)...  18
                           EMERGENCY VEHICLE TYPE EV3 (TONS)...  25
                           EMERGENCY VEHICLE GROSS (TONS)......  30