This page created: 03/13/2023 07:22:29 AM                       Click here for Comprehensive Report

COUNTY: MADISON   (Supervisor District 5)     DATE OF LAST INSPECTION.: 1020

STRUCTURE NUMBER...: SA4500000000115
LOCATION...........: SEC  7 T10N R 4E B
FACILITY CARRIED...: MOUNT PILGRIM RD  
FEATURE INTERSECTED: POPLAR CREEK             
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1988
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 120
BYPASS/DETOUR LENGTH.:  6 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



ELIGLBLE FOR LSBP FUNDS..: NO

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  24
                           HS SHORT (TONS).....................  29
                           HS LONG (TONS)......................  36