|                   |
This page created: 01/27/2026 07:25:50 AM
COUNTY: NEWTON (Supervisor District 3) DATE OF LAST INSPECTION.: 0725
[Supervisor District 3]
STRUCTURE NUMBER...: SA510000000A115
LOCATION...........: SEC 1 T 8N R10E B
FACILITY CARRIED...: PROSPECT CEDAR LN
FEATURE INTERSECTED: BCH OF SIPSEY CREEK
FUNCTIONAL CLASS...: RURAL LOCAL
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
BRIDGE LENGTH.........: 92.8 FT
NUMBER OF SPANS.......: 3
SKEW ANGLE............: 00 DEG
APPROACH ROADWAY WIDTH: 26.6 FT
BRIDGE ROADWAY WIDTH..: 27.9 FT
YEAR BUILT......................: 2025
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 200
BYPASS/DETOUR LENGTH.: 5 MI.
DECK RATING..........: 8 - VERY GOOD CONDITION
SUPERSTRUCTURE RATING: 8 - VERY GOOD CONDITION
SUBSTRUCTURE RATING..: 8 - VERY GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........:
A - OPEN NO RESTRICTIONS
|