This page created: 03/16/2026 08:28:18 AM                       Click here for Comprehensive Report

COUNTY: PIKE   (Supervisor District 3)        DATE OF LAST INSPECTION.: 0125
               [Supervisor District 3]        INSPECTION INTERVAL.....: 12 MONTHS
STRUCTURE NUMBER...: SA5700000000134
LOCATION...........: SEC 21 T 3N R 9E B
FACILITY CARRIED...: PIKE ROAD 93 N    
FEATURE INTERSECTED: BOGUE CHITTO RIVER       
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 302

    STEEL STRINGER/MULTI-BEAM OR GIRDER

YEAR BUILT......................: 1963
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 410
BYPASS/DETOUR LENGTH.:  4 MI. 

DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 4 - POOR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)...................... 28
                           HS SHORT (TONS).....................  33
                           HS LONG (TONS)......................  38
                           EMERGENCY VEHICLE TYPE EV2 (TONS)...  17
                           EMERGENCY VEHICLE TYPE EV3 (TONS)...  22
                           EMERGENCY VEHICLE GROSS (TONS)......  31