This page created: 04/13/2026 07:28:54 AM

COUNTY: PIKE   (Supervisor District 3)        DATE OF LAST INSPECTION.: 1025
               [Supervisor District 3]        INSPECTION INTERVAL.....: 12 MONTHS
STRUCTURE NUMBER...: SA5700000000165
LOCATION...........: SEC 32 T 4N R 8E  
FACILITY CARRIED...: COLE THOMAS ROAD  
FEATURE INTERSECTED: CLEAR CREEK              
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1985
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 280
BYPASS/DETOUR LENGTH.:  3 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 7 - GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: P - Posted for load
                            
                           TANDEM AXLE (TONS)..................  19
                           EMERGENCY VEHICLE SINGLE AXLE (TONS)  14
                           EMERGENCY VEHICLE TANDEM AXLE (TONS)  17
                           EMERGENCY VEHICLE GROSS (TONS)......  24