This page created: 03/16/2026 08:28:18 AM                       Click here for Comprehensive Report

COUNTY: PIKE   (Supervisor District 3)        DATE OF LAST INSPECTION.: 0226
               [Supervisor District 3]        INSPECTION INTERVAL.....: 24 MONTHS
STRUCTURE NUMBER...: SA570000000A132
LOCATION...........: SEC  3 T 3N R 9E B
FACILITY CARRIED...: BRENT ROAD        
FEATURE INTERSECTED: TOPISAW CREEK            
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 502

    PRESTRESSED CONCRETE STRINGER/MULTI-BEAM OR GIRDER

YEAR BUILT......................: 2019
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 190
BYPASS/DETOUR LENGTH.:  5 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 8 - VERY GOOD CONDITION
SUBSTRUCTURE RATING..: 7 - GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS