This page created: 01/27/2026 07:25:50 AM 

COUNTY: SUNFLOWER   (Supervisor District 5)   DATE OF LAST INSPECTION.: 1025
                    [Supervisor District 5]
STRUCTURE NUMBER...: SA6700000000158
LOCATION...........: SEC 16 T24N R 3W  
FACILITY CARRIED...: WEST MINOT ROAD   
FEATURE INTERSECTED: NATURAL BAYOU            
FUNCTIONAL CLASS...: RURAL LOCAL
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

BRIDGE LENGTH.........:    38.1 FT
NUMBER OF SPANS.......: 2
SKEW ANGLE............: 00 DEG
APPROACH ROADWAY WIDTH: 25.9 FT
BRIDGE ROADWAY WIDTH..: 23.3 FT

YEAR BUILT......................: 1970
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 30
BYPASS/DETOUR LENGTH.:  6 MI. 

DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 3 - SERIOUS CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION

BRIDGE PROGRAM ELIGLBLITY: LSBP
BRIDGE POSTING...........: 
                           E - Open, temporary structure in place to carry
                               legal loads while original structure is
                               closed and awaiting replacement or
                               rehabilitation