|                   |
This page created: 03/16/2026 08:28:18 AM Click here for Comprehensive Report
COUNTY: TISHOMINGO (Supervisor District 2) DATE OF LAST INSPECTION.: 1024
[Supervisor District 2] INSPECTION INTERVAL.....: 24 MONTHS
STRUCTURE NUMBER...: SA710000000A001
LOCATION...........: SEC 9 T 2S R 9E B
FACILITY CARRIED...: CR 298
FEATURE INTERSECTED: CANEY CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 2022
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 110
BYPASS/DETOUR LENGTH.: 10 MI.
DECK RATING..........: 8 - VERY GOOD CONDITION
SUPERSTRUCTURE RATING: 8 - VERY GOOD CONDITION
SUBSTRUCTURE RATING..: 8 - VERY GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS
EMERGENCY VEHICLE TYPE EV2 (TONS)... 17
EMERGENCY VEHICLE TYPE EV3 (TONS)... 28
EMERGENCY VEHICLE GROSS (TONS)...... 39
|