|                   |
This page created: 04/28/2026 07:37:05 AM
COUNTY: WALTHALL (Supervisor District 4) DATE OF LAST INSPECTION.: 0126
[Supervisor District 4] INSPECTION INTERVAL.....: 24 MONTHS
STRUCTURE NUMBER...: SA7400000000072
LOCATION...........: SEC 6 T 3N R11E B
FACILITY CARRIED...: WOOD BOYD ROAD
FEATURE INTERSECTED: VARNELL CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119
CONCRETE BOX BRIDGE
YEAR BUILT......................: 1989
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 120
YEAR OF ADT..........: 2026
BYPASS/DETOUR LENGTH.: 3 MI.
DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 5 - FAIR CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS
|