This page created: 03/16/2026 08:28:18 AM                       Click here for Comprehensive Report

COUNTY: WALTHALL   (Supervisor District 4)    DATE OF LAST INSPECTION.: 0925
                   [Supervisor District 4]    INSPECTION INTERVAL.....: 12 MONTHS
STRUCTURE NUMBER...: SA7400000000074
LOCATION...........: SEC 17 T 3N R11E B
FACILITY CARRIED...: RUSHING TOWN ROAD 
FEATURE INTERSECTED: VARNELL CREEK            
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1964
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 390
BYPASS/DETOUR LENGTH.:  3 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: B - Open, posting recommended but not legally implemented
                            
                           H TRUCK (TONS)......................  6
                           HS SHORT (TONS).....................   8
                           HS LONG (TONS)......................  10
                           EMERGENCY VEHICLE TYPE EV2 (TONS)...   4
                           EMERGENCY VEHICLE TYPE EV3 (TONS)...   5
                           EMERGENCY VEHICLE GROSS (TONS)......   7