This page created: 03/16/2026 08:28:18 AM                       Click here for Comprehensive Report

COUNTY: WAYNE   (Supervisor District 1)       DATE OF LAST INSPECTION.:     
                [Supervisor District 1]       INSPECTION INTERVAL.....: 24 MONTHS
STRUCTURE NUMBER...: SA770000000A008
LOCATION...........: SEC 15 T 6N R 6W  
FACILITY CARRIED...: CHCORA-GREEN CO RD
FEATURE INTERSECTED: HENRY CREEK              
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119

    CONCRETE BOX BRIDGE

YEAR BUILT......................: 2026
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 50
BYPASS/DETOUR LENGTH.:  8 MI. 

DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 9 - EXCELLENT CONDITION
CHANNEL RATING.......:   - FAILED CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: G - New structure not yet open to traffic