This page created: 03/16/2026 08:28:18 AM                       Click here for Comprehensive Report

COUNTY: YAZOO   (Supervisor District 2)       DATE OF LAST INSPECTION.: 0925
                [Supervisor District 2]       INSPECTION INTERVAL.....: 12 MONTHS
STRUCTURE NUMBER...: SA8200000000104
LOCATION...........: SEC 18 T11N R 2E B
FACILITY CARRIED...: VAUGHAN ROAD      
FEATURE INTERSECTED: PEPPER CREEK             
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1976
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 480
BYPASS/DETOUR LENGTH.:  6 MI. 

DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)...................... 11
                           HS SHORT (TONS).....................  14
                           HS LONG (TONS)......................  18
                           EMERGENCY VEHICLE TYPE EV2 (TONS)...   7
                           EMERGENCY VEHICLE TYPE EV3 (TONS)...   9
                           EMERGENCY VEHICLE GROSS (TONS)......  12