Last Updated: 08-28-2025
Contracts Awarded in July
All Awarded Contracts
Plans, Contract Documents and User Lists are exclusively available through the respective County/LSBP Engineer's Offices.
DO NOT contact OSARC for this information.
* = Project Changed
Click underlined projects for info.
Green - Contract Awarded. | Red - Under Advisement / Bids Rejected.
Blue - Pay Items and Quantities Available. | Orange - Emergency Project.
July 2025 |
|||
---|---|---|---|
01- | LSBP-26(22) | Holmes | 0.089 mi. of Bridge and Gravel Approaches |
30- | SAP-33(21)M | Jefferson Davis | 0.225 of Maintenance (Other than Bridge) |
31- | LSBP-06(27) | Bolivar | 0.098 mi. of Bridge and Gravel Approaches |
August 2025 |
|||
01- | SAP-37(18)M | Lamar | 12.832 mi. of Overlay |
04- | SABP-42(01) | Leflore | 0.309 mi. of Bridge and Gravel Approaches |
15- | SABP-52(03) | Noxubee | 0.000 mi. of Bridge Repair |
21- | SAP-06(9)S | Bolivar | 15.513 mi. of Base and Surfacing |
27- | SAP-44(14)M | Lowndes | 0.106 mi. of Bridge Repair |
27- | SAP-74(65) | Walthall | 0.326 mi. of Maintenance (Other than Bridge) |
29- | SAP-72(75) | Tunica | 0.180 mi. of Bridge and Approaches |
29- | SAP-77(12)M | Wayne | 0.038 mi. of Maintenance (Other than Bridge) |
September 2025 |
|||
02- | LSBP-16(25) | Covington | 0.076 mi. of Bridge and Gravel Approaches |
02- | SAP-39(19)M | Lawrence | 26.081 mi. of Maintenance (Other than Bridge) |
10- | LSBP-06(28) | Bolivar | 0.113 mi. of Bridge and Gravel Approaches |
10- | LSBP-38(41) | Lauderdale | 0.046 mi. of Box Bridge and Gravel Approaches |
12- | LSBP-52(23) | Noxubee | 0.074 mi. of Box Bridge and Gravel Approaches |
15- | LSBP-81(21) | Yalobusha | 0.022 mi. of Bridge and Gravel Approaches |
25- | SAP-26(21)S * | Holmes | 33.521 mi. of Reseal 7.385 Mi of Overlay and Leveling Letting Date Corected to 10-02-2025 |
30- | LSBP-20(15) | George | 0.086 mi. of Bridge and Gravel Approaches |
October 2025 |
|||
01- | LSBP-21(14) | Greene | 0.131 mi. of Box Bridge and Gravel Approaches |
02- | SAP-26(21)S | Holmes | 33.521 mi. of Reseal |
06- | LSBP-66(17) | Stone | 0.070 mi. of Bridge and Gravel Approaches |
06- | SAP-81(17)M | Yalobusha | 79.922 mi. of Striping |
07- | SAP-64(21)S | Simpson | 3.552 mi. of Reseal, Base Repair, Leveling, Chip Seal, Fog Seal and Striping |
07- | SAP-64(24)S | Simpson | 3.319 mi. of Reseal, Base Repair, Leveling, Chip Seal, Fog Seal and Striping |