OSARC Bid Calendar

Last Updated: 04-07-2026

Contracts Awarded in March
All Awarded Contracts

Plans, Contract Documents and Bidder Lists are exclusively available through the respective County/LSBP Engineer's Offices.
DO NOT contact OSARC for this information.

* = Project Changed

Click underlined projects for info.
Green - Contract Awarded. | Red - Under Advisement / Bids Rejected.
Blue - Pay Items and Quantities Available. | Orange - Emergency Project.

RSS Bid Calendar RSS Feed

March 2026

10- SAP-33(23)M Jefferson Davis 0.082 mi. of Maintenance (Other than Bridge)
11- SAP-22(8)M Grenada 3.210 mi. of Maintenance (Other than Bridge)
18- LSBP-24(20) Harrison 0.028 mi. of Bridge and Gravel Approaches
26- SAP-33(26)M Jefferson Davis 8.308 mi. of Maintenance (Other than Bridge)
26- LSBP-76(33) Washington 0.057 mi. of Bridge and Gravel Approaches
30- SAP-29(21)S Itawamba 16.640 mi. of Reseal

April 2026

01- LSBP-06(25)* Bolivar 0.041 mi. of Box Culvert and Gravel Approaches Letting rescheduled from 03-03-2026
07- SAP-20(12)M George 4.206 mi. of Overlay
07- SAP-20(13)M George 2.135 mi. of Overlay
07- SAP-20(16)S George 3.913 mi. of Reseal (Micro-Surfacing)
07- SAP-45(20)S Madison 3.056 mi. of Reseal
10- SAP-15(12)M Copiah 12.828 mi. of Maintnenace (Other Than Bridge)
10- SAP-61(20)M* Rankin 13.217 mi. of Base and Surfacing Letting rescheduled to 04-21-2026
15- LSBP-25(57) Hinds 0.047 mi. of Box Bridge and Gravel Approaches
15- LSBP-25(60) Hinds 0.086 mi. of Bridge and Gravel Approaches
16- LSBP-33(23) Jefferson Davis 0.023 mi. of Box Bridge and Gravel Approaches
20- SABP-60(01)* Quitman 0.113 mi. of Bridge and Approaches Letting rescheduled from 04-16-2026
21- SAP-61(20)M* Rankin 13.217 mi. of Base and Surfacing Letting rescheduled from 04-10-2026
24- SAP-04(09)M Attala 3.435 mi. of Maintenance (other then Bridge)

May 2026

04- SABP-07(01) Calhoun 0.083 mi. of Bridge and Approaches
04- SABP-09(01) Chickasaw 0.040 mi. of Bridge and Approaches
04- SAP-09(21)S Chickasaw 9.430 mi. of Maintenance (Other Than Bridge)
06- SAP-75(32)M Warren 1.552 mi. of Overlay
08- LSBP-15(21) Copiah 0.147 mi. of Bridge and Gravel Approaches
08- LSBP-61(07) Rankin 0.057 mi. of Bridge and Gravel Approaches
11- SAP-43(17)M Lincoln 27.157 mi. of Maintenance (Other Than Bridge)
12- SAP-19(75) Franklin 0.170 mi. of Grade, Drain, Base and Surfacing
13- SAP-26(21)S Holmes 25.857 mi. of Reseal
13- SAP-79(12)M Wilkinson 7.400 mi. of Maintenance (Other Than Bridge)
20- LSBP46(20) Marion 0.085 mi. of Bridge and Gravel Approaches